The issue of how to best manage the wastes resulting from the bitumen extraction processes  
is complex.  
When clays contained in the oil sands are subjected to the Clark Hot Water Extraction  
Process a sludge is formed. This sludge is contained in large tailings ponds. It is very  
stable and releases the water it contains very slowly. The sludge accumulates during the  
operational phase of the project and will be fluid long after the project is completed.  
Ultimate reclamation of the sludge pond areas is a significant environmental issue. •Permanent ponds that are geotechnically secure can be constructed. Wet ponds are  
technically necessary and the environmental issues can be managed.  
This is a complex multi-disciplinary problem with far reaching implications. A coordinated  
and co-operative management approach that will integrate the needs of the various stakeholders  
is necessary.