Search Results
Displaying:
1 - 20 of 22
Dissipation of Bromacil in Humic Luvic Gleysols in Northwestern Alberta
Resource
Dissipation of bromacil in Humic Luvic Gleysols amended with cow manure was evaluated at two sites in northwestern Alberta from 1984 to 1987
Effect of Pipeline Construction on Soil Compaction in Alberta
Resource
No clear relationships emerged between soil Orders, zones, or soil parent materials and the effect of pipeline construction on soil compaction. Soil moisture conditions appear to be more important.
Effect of Pipeline Construction on Soil Strengths of Soil Horizons in Alberta: 1990 Final Report
Resource
At each of the fifteen 1989 study areas and at each of the eight 1988 study areas soil strength was monitored using a cone penetrometer in 15 cm depth increments to a depth of 52.5 cm.
First Nations Species at Risk Dialogues
Event
Event Date and Time
March 2nd, 2022 at 9:30am PST to March 9th, 2022 at 10:00am PST
Organization
The IISAAK OLAM Foundation and the Assembly of First Nations (AFN) are inviting all First Nations persons who have experience with monitoring, harvesting, and managing species at risk (SAR) and...
Impacts of Overstripping Topsoil on Native Rangelands in Southeastern Alberta: A Literature Review
Resource
Available information indicates that overstripping and subsequent replacement of topsoil can produce horizon characteristics similar to plow depth characteristics resulting from cultivation
Indigenous Women's Leadership: The Trailblazers of Conservation
Event
Event Date and Time
March 8th, 2022 at 1:00pm EST to March 8th, 2022 at 3:00pm EST
Organization
Join us as we celebrate and honour Indigenous women trailblazers of all ages in conservation leadership. This intergenerational discussion will explore the contributions of fearless Indigenous women...
Minimal Disturbance Pipeline Construction Procedures in Peatland Areas
Resource
TransCanada presents an account of pipeline construction methods implemented in the boreal regions of Alberta.
Pipeline Reclamation Techniques
Resource
Successful reclamation of a pipeline right-of-way is contingent upon the proper material handling procedure, especially for topsoil conservation. NOVA's practice of topsoil conservation is discussed...
Preliminary Caribou Habitat Restoration Plan for the Leismer to Kettle River Crossover Project
Resource
On September 20, 2012, NOVA Gas Transmission Ltd. (NGTL) received approval for the Leismer to Kettle River Crossover Project. Approximately 63 km of this pipeline will be constructed within the...
Prompt Rewetting of Drained Peatlands Reduces Climate Warming Despite Methane Emissions
Resource
Peatlands are strategic areas for climate change mitigation because of their matchless carbon stocks. Drained peatlands release this carbon to the atmosphere as carbon dioxide (CO2). Peatland...
Quantifying Restoration Success via Natural Recovery in Forested Areas Following Pipeline Construction
Resource
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Rangeland Revegetation Monitoring on Two Pipeline Rights-of-Way in Southern Alberta
Resource
Compare vegetative productivity, plant species composition and animal utilization on pipeline right-of-way to that of the adjacent native grassland. Field assessments were conducted over 4 years
Reclamation and Industry in Alberta Today and Tomorrow (1990s)
Resource
This paper provides the author's perspective on a series of questions posed by the symposium's Organizing Committee. The paper does not represent an endorsed industry wide collective response...
Soil Compaction: A Literature Review
Resource
Concerns about soil compaction on pipeline rights-of-way have increased with the introduction of heavier, more powerful construction equipment
Stories of Inuit-led Conservation
Event
Event Date and Time
March 17th, 2022 at 1:00pm EST to March 17th, 2022 at 3:00am EST
Organization
Join us to learn about Inuit-led conservation initiatives in Labrador and Nunavut. Dr. Jamie Snook (Torngat Secretariat) and Derrick Pottle (Knowledge Holder, Guide, and Polar Bear Specialist) will...
The Long-term Impact of Pipeline Construction on Solonetzic Mixed Prairie
Resource
Study concentrated on the well-documented 1981 right-of-way, and compared it to the oldest trench, installed in 1957, and to the undisturbed adjacent mixed prairie
The "Winter" Topsoil Stripper
Resource
NOVA, AN ALBERTA CORPORATION embarked on a research and development project approximately one and one-half years ago to develop a machine capable of stripping frozen topsoil . The result was a...
Topsoil Handling During Pipeline Construction in Potentially Arable Forested Luvisols of Northwest Alberta
Resource
Objective was to evaluate several pipeline topsoil stripping depths to determine whether they result in land capability equivalent to that of adjacent forested lands broken for cultivation