Search Results
Displaying:
1 - 20 of 25
Dissipation of Bromacil in Humic Luvic Gleysols in Northwestern Alberta
Resource
Dissipation of bromacil in Humic Luvic Gleysols amended with cow manure was evaluated at two sites in northwestern Alberta from 1984 to 1987
Effect of Pipeline Construction on Soil Compaction in Alberta
Resource
No clear relationships emerged between soil Orders, zones, or soil parent materials and the effect of pipeline construction on soil compaction. Soil moisture conditions appear to be more important.
Effect of Pipeline Construction on Soil Strengths of Soil Horizons in Alberta: 1990 Final Report
Resource
At each of the fifteen 1989 study areas and at each of the eight 1988 study areas soil strength was monitored using a cone penetrometer in 15 cm depth increments to a depth of 52.5 cm.
Impacts of Overstripping Topsoil on Native Rangelands in Southeastern Alberta: A Literature Review
Resource
Available information indicates that overstripping and subsequent replacement of topsoil can produce horizon characteristics similar to plow depth characteristics resulting from cultivation
Minimal Disturbance Pipeline Construction Procedures in Peatland Areas
Resource
TransCanada presents an account of pipeline construction methods implemented in the boreal regions of Alberta.
Native Prairie Protocol for Salt-Affected Wellsites Scientific Rationale Document
Resource
There are a large number of oil and gas sites with salts in soil that exceed one or more generic guideline values. The nature of generic guidelines is that, by definition, they do not uniquely...
Pipeline Reclamation Techniques
Resource
Successful reclamation of a pipeline right-of-way is contingent upon the proper material handling procedure, especially for topsoil conservation. NOVA's practice of topsoil conservation is discussed...
Preliminary Caribou Habitat Restoration Plan for the Leismer to Kettle River Crossover Project
Resource
On September 20, 2012, NOVA Gas Transmission Ltd. (NGTL) received approval for the Leismer to Kettle River Crossover Project. Approximately 63 km of this pipeline will be constructed within the...
Quantifying Restoration Success via Natural Recovery in Forested Areas Following Pipeline Construction
Resource
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Rangeland Revegetation Monitoring on Two Pipeline Rights-of-Way in Southern Alberta
Resource
Compare vegetative productivity, plant species composition and animal utilization on pipeline right-of-way to that of the adjacent native grassland. Field assessments were conducted over 4 years
Reclamation of the Gregg River Mine, Canada
Resource
Reclamation of 1,362 hectare mine site; recent carnivore activity is one indication of the eventual return of a healthy, balanced and sustainable ecosystem to the reclaimed Gregg River mine site.
Revealing the Hidden Carbon in Forested Wetland Soils
Resource
Inland wetlands are critical carbon reservoirs storing 30% of global soil organic carbon (SOC) within 6% of the land surface. However, forested regions contain SOC-rich wetlands that are not included...
Risk-based Soil Remediation Guidelines in Coal Mine Closure
Resource
Assessment of the Coleman facility found a range of contaminants exceeding Alberta’s default soil guidelines including benzene, toluene, ethylbenzene, and xylenes (BTEX) and other hydrocarbon compound
Salt-Affected Wellsite Closure Project Background Document
Resource
The current document reports specifically on issues relating to the ecological direct contact exposure pathway (growth and reproduction of plants and soil invertebrates) in native grasslands areas of...
Salt-Affected Wellsite Closure Project Scientific Rationale Document
Resource
The current document is focussed specifically on issues relating to the ecological direct contact exposure pathway (growth and reproduction of plants and soil invertebrates) in native grasslands areas...
Soil Compaction: A Literature Review
Resource
Concerns about soil compaction on pipeline rights-of-way have increased with the introduction of heavier, more powerful construction equipment
The Long-term Impact of Pipeline Construction on Solonetzic Mixed Prairie
Resource
Study concentrated on the well-documented 1981 right-of-way, and compared it to the oldest trench, installed in 1957, and to the undisturbed adjacent mixed prairie