Search Results
Displaying:
1 - 8 of 8
Bipole III Transmission Project – Mammals Monitoring Program
Project
Contact
Organization:
The Bipole III Transmission Project is a 1,388 km high voltage direct current (HVDC) transmission project traversing several ecozones. The project starts at the Keewatinohk converter station near...
Bipole III Transmission Project: Annual Monitoring Reports
Resource
The Bipole III Transmission Project is a 1,388 km high voltage direct current (HVDC) transmission project traversing several ecozones. The project starts at the Keewatinohk converter station near...
Denitrification Potential of Surface Soils of Constructed Wetlands in Newtown Creek, an Urban Superfund Site
Resource
Denitrification, the anaerobic microbial conversion of nitrate (NO 3 −), a common water pollutant, to nitrogen (N) gases, is often high in the soil of natural wetlands. In areas where natural wetlands...
Perfluoroalkyl Substances in Circum-Arctic Rangifer: Caribou and Reindeer
Resource
Livers of caribou and reindeer (Rangifer tarandus) from Canada (n = 146), Greenland (n = 30), Svalbard (n = 7), and Sweden (n = 60) were analyzed for concentrations of eight perfluoroalkyl carboxylic...
Wetland Mitigation on Manitoba Hydro Transmission Rights of Way: From Planning to Operations
Resource
This presentation provides an overview of Manitoba Hydro's planning through to operations approach to wetland mitigation on their rights of ways.