Wetlands Knowledge Search Results
Resource
Authors
Mark Baah-Acheamfour
Mark Dewey
Erin Fraser
Stefan Schreiber
Amanada Schoonmaker
Empirical evaluations of reclamation success are critical for understanding the speed of ecosystem recovery and improving best practices. In this study, we provide a quantitative evaluation of the...
Resource
We conducted a full peatland assessment using the new criteria on a restored well pad near Peace River, Alberta. In 2012, mineral overburden was removed along with geo-textile and the buried peat was...
Resource
Authors
Justin Straker
Gillian Donald
This paper presents information on RWG’s approach to the guidance and assessment of reforestation of oil sands mine disturbances
Resource
Authors
Alberta Biodiversity Monitoring Institute
Alberta Innovates - Technology Futures
With few exceptions, permeability across in situ developments was the main factor affecting caribou movement. Relationship was non-linear, suggesting a minimum threshold of permeability is needed
Resource
Authors
Alberta Biodiversity Monitoring Institute
Alberta Innovates - Technology Futures
Salmo Consulting
At current levels of industrial development, pipelines and linear features have a very small negative effect on caribou populations compared to the high levels of predation.
Resource
Authors
Sarah Ficko
Diane Haughland
Anne Naeth
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...
Resource
Pesticide Chemicals Branch of Alberta Environment conducted a monitoring program in 1979 related to two methoxychlor treatments of the Athabasca River for black fly (Simulium arcticum) control.
Resource
The use of methoxychlor in the Athabasca River to control black fly (Diptera: Simuliidae) larvae was monitored in 1980. Effective control of black fly was observed for a distance of 60 km
Resource
Population reductions of non-target organisms in the Athabasca River due to methoxychlor was limited for the May 20/21 treatment but was considerable for the June 19 treatment.
Resource
13 recommendations related to tailings, reclamation, data access, regional plan, economics, research coordination, groundwater and the Athabasca River
Resource
Authors
Enrique Doblas-Miranda
Daniel Kneeshaw
Phil Burton
Barry Cooke
Marie-Josée Fortin
David MacLean
Rongzhou Man
Michael Papaik
Brian Sturtevant
Insect outbreaks are natural and recurring disturbances that have a greater impact on wood-fibre supply than wildfires. Proactive rather than reactive management strategies provide the best...
Resource
Authors
John Kansas
Marc Symbaluk
Goals: Maintain and enhance focal species habitat and populations; preserve pre-disturbance or modified recreational land use opportunities; and approximate pre-disturbance native biological diversity
Resource
Authors
W.R. Dempster and Associates Ltd.
data were used to define reasonable expectations of early growth performance under prevailing environmental conditions, as a basis for evaluating the success of reforestation following coal mining
Resource
Authors
Aneta Spyra
Anna Cieplok
Mariola Krodkiewska
Beaver-created ponds constitute an important element of small water retention in forest catchments and preserving biodiversity as breeding sites for vertebrates and invertebrates. In many areas, these...
Resource
Nitrogen and complete fertilizer applications improved growth of white spruce on overburden sites. Fertilization did not, however, have an effect on lodgepole pine growth on tailings sand sites
Resource
Understanding how birds respond to landscape disturbance is key to effective restoration. Two studies used non-invasive microphone arrays to determine the exact locations of singing individuals in the...
Resource
Mounding is a common restoration technique designed to improve microsite conditions for planted seedlings in wetlands. There are a variety of strategies for constructing mounds, though, and how mounds...
Resource
Authors
Ontario Environment, Conservation and Parks
These Best Management Practices ( BMPs) are meant to be used by mineral exploration and development proponents who are planning or conducting early exploration, advanced exploration, mine production...
Resource
The Bipole III Transmission Project is a 1,388 km high voltage direct current (HVDC) transmission project traversing several ecozones. The project starts at the Keewatinohk converter station near...
Resource
Authors
Jesse Tigner
Erin Bayne
Stan Boutin
Resource Date:
January
2014
This resource is available on an external database and may require a paid subscription to access it. It is included on the CCLM to support our goal of capturing and sharing the breadth of all...