Boreal Caribou Search Results
Resource
Authors
Xiaomei Li
Yongsheng Feng
A one dimensional approach was used to model the evaporation process from fine tails. Understanding the complex interactions among the solids, water and external atmospheric demand is required
Resource
Stem cuttings of balsam poplar and three poplar hybrids were directly planted onto reclamation material ontailings dyke slope. The overall rooting success was poor - direct planting is not recommended
Resource
The trial was established on blended materials consisting of native sand, clayey overburden and peat. Nine native grasses and eight cultivated grass varieties were seeded in June of 1981.
Resource
Pilot study to assess the use of early successional stands (i.e. those ranging in age from 4 to 17 years) by wildlife (songbirds, small mammals, and ungulates), using a wildlife monitoring protocol
Resource
Authors
Roger DeAbreu
Shane Patterson
Todd Shipman
Chris Powter
NRCan pilot science projects have proven that Earth Observation can provide relevant and valuable information to inform and enhance monitoring and support regulatory frameworks
Resource
Authors
ERMP Project Advisory Group
Monitoring protocols for forested land wellsites to determine if a reclaimed site has returned to similar structure and function as found in a representative undisturbed reference area.
Resource
Authors
Alberta Biodiversity Monitoring Institute
Three workshops were held to examine a suite of vegetation, soil, and habitat indicators that could potentially be used to monitor recovery in a long-term reclamation monitoring program
Resource
Authors
ERMP Project Advisory Group
This report provides the monitoring protocols for forested land wellsites.
Resource
Authors
ERMP Project Advisory Group
The Ecological Recovery Monitoring Program should be implemented in stages to allow for incorporation of learnings and additional research to support design of protocols for new disturbance types.
Resource
Authors
ERMP Project Advisory Group
This report describes several specialized monitoring techniques that were evaluated during the Ecological Recovery Monitoring Program Pilot.
Resource
Authors
Robert Danielson
Suzanne Visser
The overall objectives of these studies were to characterize the mycorrhizal status of jack pine and green alder which are prime candidates as reclamation species for oil sand tailings
Resource
Authors
Karen Cannon
Nancy Finlayson
Sandra Landsburg
At each of the fifteen 1989 study areas and at each of the eight 1988 study areas soil strength was monitored using a cone penetrometer in 15 cm depth increments to a depth of 52.5 cm.
Resource
Authors
Cole Burton
Christopher Beirne
Catherine Sun
Erin Tattersall
Joanna Burgar
Jason Fisher
This project has clearly demonstrated the utility of camera trap surveys for monitoring restoration effectiveness in boreal environments. The cameras facilitated the collection of longitudinal data on...
Resource
Document presents the scientific and engineering expertise to guide all reclamation activities associated with end pit lake design and construction
Resource
Authors
C.W. Greer
N. Onwuchekwa
Janusz Zwiazek
A. Quoreshi
S. Roy
Francis Salifu
Damase Khasa
Preliminary results, after two growth seasons, show promise in the use of pre-inoculated seedlings in enhancing growth and establishment of alders and conifers on oil sands reclamation sites.
Resource
This handbook recognizes the potential adverse impact of pipeline construction on the environment and the public and identifies environmental protection measures to minimize those impacts.
Resource
Authors
Oil Sands Research and Information Network
opportunity for 60 reclamation specialists to share views about Equivalent Land Capability and how it is applied to oil sands mine reclamation, and to identify research and information needs
Resource
Authors
Herman Vaartnou
Gerry Wheeler
Research project set up to study the establishment and survival of ground cover vegetation on roadsides, utility rights-of-way, and non-cultivated disturbed areas in Alberta
Resource
Authors
Gerry Wheeler
Herman Vaartnou
Powerline rights-of-way were surveyed throughout Alberta to find out what vegetation was growing on them and if reseeding was required. The Whitewood coal mine at Wabamun was surveyed
Resource
Authors
Gerry Wheeler
Herman Vaartnou
General survey of roadside vegetation done to see what species it consisted of. The results were then compared to the Department of Highways and Transport's records of seeding conducted from 1963-1972